Loading the job…
Projects / DFW
Haskell (site unstated) · DFW
One tap to update. Drag the card on the board. Undo is available on the card.
2M only
Not in email text
Members never receive this field.
2 files
Download everything for this job here. Quotes and pricing files are 2M only; other files default to the desk or your company plus 2M.
Haskell-budget-quote.pdf
Quote · v1 · 101 B · 2M only · 2M
Haskell-site-plan.pdf
Plans · v1 · 95 B · All desk members · 2M
Read from uploaded plans and specs. Drafts stay here until a person sends them.
No Division 26 or 27 reading yet.
Spec, distributor quote, and manufacturer support can all be claimed. The same role twice is a conflict, not a block. Claims last 30 days.
Strength comes from how often and how recently someone emailed. Message text stays private.
No relationship metadata on this job yet.
Hold-to-talk from the phone, or upload a recording. Transcription uses the hook when it is configured.
In Spec is only when 2M is working with an engineering firm. Otherwise use Quote / Negotiation, then Handed Off or Quoted.
Who carries each contractor — a 2M, Legrand, or Bell & McCoy person. Nobody gets two numbers from Legrand.
No contractor named yet.
IFC cable bus BOM 9/23. Jason running it. Site still unstated.
Sep 26, 2026 · Next: Jason keeps the IFC BOM. Confirm the site before a contractor is named.
Lonestar Electric (J. Jacobi); others
Nick/Jason mail; Emma pipeline note
RFQ 7/12 (bid 7/16); IFC cable bus BOM 9/23 - Jason running it. Salesforce: "Haskell Data Center" $5.44M quoted on CED Dallas
Sep 26, 2026 · seed:project-haskell
No comments yet. Leave the next step where the other firms can see it.
Imported from the 12 Oct 2026 PBW list, DFW to Waco.